Out-of-gauge food processing line from Slough to Ho Chi Minh City

A complete food processing line, including oversized sections that would not fit a standard container, moved from a Slough factory to a new plant in Vietnam as one coordinated project.

Client
A UK food machinery manufacturer
Cargo
Food processing line in sections, including two out-of-gauge units
Origin
Slough Trading Estate, United Kingdom
Destination
Processing plant near Ho Chi Minh City, Vietnam
Mode
Road to port, sea freight on flat racks and standard containers
Timescale
Eight weeks from site survey to delivery on site

The challenge

Our client had sold a complete processing line to a new plant in southern Vietnam. The line had been built and tested at their factory in Slough and then broken down into sections for shipping.

Most of the sections would fit into standard containers, but two of them were too wide and too tall for a closed box. The whole line had to arrive together so the installation engineers could start work on schedule, and the machinery needed protection from moisture and movement over several weeks at sea. The client wanted one partner to manage the collection, packing, road, sea and delivery legs rather than several separate suppliers.

Regency’s solution

We began with a site survey at the client's factory to measure each section, agree lifting points and check access for vehicles and cranes. From the survey, we produced a loading plan that put most of the line into 40ft containers and assigned the two oversized units to flat racks.

Our export packing team built custom crates and bases for the smaller sections and protected the oversized units with shrink wrap, desiccant and secure lashing points. We arranged the lift at the factory and specialist vehicles for the out-of-gauge road leg to the port, with the notifications required for the wider loads.

We booked all of the containers and flat racks on the same sailing so the line would arrive together. Our partner in Vietnam handled import clearance, port handling of the flat racks and final delivery to the plant, including a crane for offloading. The client received a single set of documents and regular updates throughout the voyage.

The result

The complete line arrived at the plant together and without damage, and the installation engineers started work on their planned date. Because every section was packed and labelled to the loading plan, the team on site could identify and position each unit quickly. The client dealt with one team and one set of documents from factory floor to plant floor.

The client has since asked us to plan two further overseas line installations.

Get a quote

Tell us what needs to move

A few quick questions and a member of our team will come back to you within the hour, 7 days a week.

  • Quote within the hour
  • 24/7 urgent support on +44 (0)1753 313700
  • Heathrow based, worldwide network
Our 24/7 desk is open now
Call +44 (0)1753 313700

Get a freight quote

Reply within the hour, 7 days a week

~1hr reply

Urgent? Call 24/7: +44 (0)1753 313700

  1. 1Service
  2. 2Route
  3. 3Cargo
  4. 4Extras
  5. 5Your details

Your details are only used to respond to your enquiry BIFA memberFIATA

Got something that needs to move?

Call +44 (0)1753 313700 or send the details and we’ll come back within the hour.

Call Get a quote